Royal Pacific Resort Convention Center

Lowes Resorts came to FKA, who Mr. Jensen worked for at the time and asked them to redesign the $23 million Royal Pacific Resort and cut the cost.  Mr. Jensen was able to reduce the budget to roughly $15million without sacrificing the functionality or capacity of the facility.  This building has a regional kitchen and food stores for 8 Universal restaurant properties.  The largest single line item cut was done with the Roof design.  Mr. Jensen eliminated all the internal Rain Leaders and redundant drains for a simple low slope metal roof.  "I designed the Roof edge to project the rainwater through Scupper into catch basins sitting adjacent the Storm water pond. "   The office manager changed that to the worlds largest Stainless Steel Gutter which cost $75,000!"